Details: construction works excavation in foundation in ordinary soil (loam, clay or sand) including lift upto 1.5 meters and lead upto 30 meters and including filling, watering and ramming of excavated earth into the trenches or into the space between the builiding and sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by engineer-in-charge upto a distance of 30 meters from the foundation trenches (si. no. 251) uppwd sor-2020 laying and compacting dry o.b.b. 40 mm guage in foundation in layers of not more than 15 cm. thickness including local sand, in ration 2.1 as per direction of the engineer-in-charge including cost of all materials labour t&p etc. required and including waterning & ramming for propoer completion of work. si. no. 3 new item m-150 brick work in 1:4 (one part of cement and four part of coarse sand of 2.75 f.m.) cement mortar in foundation and plinth including supply of all material, labour, t&p etc. required for proper comp
Sector: Urban Authority