Details: towan hall earth work in exacavation in trenches for foundations and for pipes cables etc.in ordinary soil ( loan clay orsand)including lift upto 1.5 m and leadup to 30m.&including filling watering& ramming of excavated earth in to trenches or in to the space between the building & the sides of foundation trenches or in to the plinth and removal & disposal of surplus excavated earth as directed by the engineer i/c upto a distance of 30 m from the foundation trenches. (si-251) filling of earth in plinth under floor including watering ,ramming , consolidating & dressing complete including lead upto 30 m . & lift upto 1.5 m & including of cost. carted up to 5 km providing of sand filling in plinth under floor including watering ,ramming, consolidating and dressing complete including supply of all material labour t&p etc. required for proper completion of the work.lead upto 50 m. and lift upto 1.5m. and including cost of sand. providing and laying in cement concrete
Sector: Urban Authority