Details: excavation of earth in ordinary soil (loam clay or sand) for pipe line and rising main trenches including lift upto 1.50 m and lead upto 50 m and refilling watering ramming of the excavated earth into the trench and also disposal of surplus earth upto 50 m from the center of the trenches including supply of all material labour t&p etc complete as per instruction of engineer-in-charge. as per s.i no 31.1 supply of following sizes (d.i) pipes for rising main/distribution system confirming to latest/relevent i.s 8329/2000 specification with all jointing material such as specials confirming to latest/relevent i.s specification suitable for d.i pipes as per is 1239/2000 and is 8329/2000 or their latest amentment including f.o.r and carting upto site of work also including specials for these pipes and lowering them into trenches and laying true to alignment and gradient and jointing etc. complete (including testing of pipe lines and cutting of pipes for making up the length but excluding the
Sector: Urban Authority