Description: sahid park bijalpur block auraiya ke parisar ki retaining wall ka nirman Name of Work
Details: Excavation in foundation in ordinary soil (loam caly, or sand). Including lift upto 1.5 mt. (5 ft.) and lead upto 30 mt. (100 fts.) and including filling waterning and raiming of excavated earth in the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and dispsal of surplus earth as directed by the engeeneer in-charge upto a distance of 30 mt. from the foundation and trenches. Earth work in cutting or In Filling In ordinary soll, excavation to be in the form of regular pits not exceeding 1/2 metre (20") in depth and earthwork in embankment to be in 20 cm (8") layers, including ramming and dressing the surface to be required levels and slops and also including 1.5 metre (5 fts) lifts and 30 m. (100') lead. The earth from cutting to be used in making filling or to be disposlted as spoil banks within 30 metres (100 fts) distance as directed by engineer-in-charge. (Rate is excluding Royality.) Concrete with 4 mm. (1.5") gau
Sector: Industries and Factories