Details: geomatrical improvement of subahsh tiraha, basti road (tahsil tiraha)dismantling manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material as per direction of engineer-in-chargetaking out existing cc interlocking paver blocks from footpath/ central verge, including removal of etc., disposal of unserviceablematerial to the dumping ground, for which payment shall be madeseparately and stacking of serviceable material as per direction of engineer-in-charge.providing and laying bituminous concrete with 100-120 tph batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compac
Sector: Urban Authority