The UPSBCL has published a tender for "Construction of Construction of RE Wall and Approach Road both side on 4 Lane Rail Over Bridge Between Level Crossing 86B-2 to 550m in East under Barhni Bypass of Gorakhpur Rail Section in District Siddharth Nagar" on the 10 Mar 2026. This tender belongs to Retaining Wall Construction category. This tender is published in Azamgarh, Uttar Pradesh location. The vendors interested in this tender and related Retaining Wall Construction tenders can obtain further details by exploring Tendersniper web portal. Tendersniper sends regular tender alerts by email specifically addressing the user requirements (i.e., keywords, location and value range). Government business is a growing area of opportunity. The businesses are encouraged to actively monitor tender opportunities and participate in them to grow their business.
Related alert: all civil works Tenders | compound wall Tenders | retaining wall construction and repair Tenders
Related categories: Civil Foundation Tenders | Grouting service Tenders | Epoxy Grouting Tenders |
UPSBCL issued 2 tenders for Retaining Wall Construction last year
With, 0 floated just last month.
| Tender Title | Construction of Construction of RE Wall and Approach Road both side on 4 Lane Rail Over Bridge Between Level Crossing 86B-2 to 550m in East under Barhni Bypass of Gorakhpur Rail Section in District Siddharth Nagar |
|---|---|
| Tender Description | r.e. wallearth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material(reference of sr. no 12.01 morth specification 304) concrete in levelling pad -rcc grade m20 using batching plant transit mixer & concrete pump. (reference of sr. no 13.5 morth specification 1500, 1700 & 2200) facing elements of rcc reinforced earth retaining wall (reinforced earth retaining walls have four main components as under: a) excavation for foundation, foundation concrete and cement concrete grooved seating in the foundation for facing elements (facia material). b) facia material and its placement. c) assembling, joining with facing elements and laying of the reinforcing elements. d) earthfill with granular material which is to be retained by the wall.) (reference of sr. no 7.4 morth specifi |
| Comments | r.e. wallearth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material(reference of sr. no 12.01 morth specification 304) concrete in levelling pad -rcc grade m20 using batching plant transit mixer & concrete pump. (reference of sr. no 13.5 morth specification 1500, 1700 & 2200) facing elements of rcc reinforced earth retaining wall (reinforced earth retaining walls have four main components as under: a) excavation for foundation, foundation concrete and cement concrete grooved seating in the foundation for facing elements (facia material). b) facia material and its placement. c) assembling, joining with facing elements and laying of the reinforcing elements. d) earthfill with granular material which is to be retained by the wall.) (reference of sr. no 7.4 morth specifi |
| Published Date | |
|---|---|
| Due Date | 10 Apr 2026 00:00:00 |
| Estimated Value | 7.7 Crore |
|---|---|
| EMD | 0 INR |
| Processing Fee | 0 INR |