The Kanpur Development Authority has published a tender for "Widening and strengthening work of Sagarpuri Road along the high tension line from Hamirpur Road (Kanpur Sagar Highway)." on the 19 Feb 2026. This tender belongs to Road Construction category. This tender is published in Kanpur Nagar, Uttar Pradesh location. The vendors interested in this tender and related Road Construction tenders can obtain further details by exploring Tendersniper web portal. Tendersniper sends regular tender alerts by email specifically addressing the user requirements (i.e., keywords, location and value range). Government business is a growing area of opportunity. The businesses are encouraged to actively monitor tender opportunities and participate in them to grow their business.
Related alert: road Tenders | road and drain Tenders | all civil works Tenders
Related categories: Bus Bay Tenders | Road related beautification Tenders | Truck-lay-by Tenders |
Kanpur Development Authority issued 3 tenders for Road Construction last year
With, 0 floated just last month.
| Tender Title | Widening and strengthening work of Sagarpuri Road along the high tension line from Hamirpur Road (Kanpur Sagar Highway). |
|---|---|
| Tender Description | part-a (road work ) cleaning jungles including uprooting of trunk vegetation grass, bushes, wood trees and sapling of girth upto 30cm measured at a height of 1 meter above ground level and removal of upto a distance of 50 meters out side the periphery of area cleared. sor-2023-24 dismentling of flexible pavement and disposal of dismantle material up to a lead of 100 meter, stacking sevicable and unseviceable materials separately. earthwork: in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m , as directed by engineer- in- charge:2.1.1 all kind of soil.0.30 m & above . (chapter -4 pwd sor-2023-24 si no-2.6 (2.6.1) preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing to camber and consolidating with road roller including making good the undulat |
| Comments | part-a (road work ) cleaning jungles including uprooting of trunk vegetation grass, bushes, wood trees and sapling of girth upto 30cm measured at a height of 1 meter above ground level and removal of upto a distance of 50 meters out side the periphery of area cleared. sor-2023-24 dismentling of flexible pavement and disposal of dismantle material up to a lead of 100 meter, stacking sevicable and unseviceable materials separately. earthwork: in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m , as directed by engineer- in- charge:2.1.1 all kind of soil.0.30 m & above . (chapter -4 pwd sor-2023-24 si no-2.6 (2.6.1) preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing to camber and consolidating with road roller including making good the undulat |
| Published Date | |
|---|---|
| Due Date | 23 Feb 2026 00:00:00 |
| Estimated Value | 18.72 Crore |
|---|---|
| EMD | 0 INR |
| Processing Fee | 0 INR |