The Uttar Pradesh Irrigation Department Mechanical has published a tender for "1st class brick lining work with 100pct. new brick and C.C on bed from chainage 1.400 km to 1.700 km including all cost of material, labour, tool and plant etc. as per bill of quantity at Rudauli pump canal district Ayodhya" on the 16 Feb 2026. This tender belongs to Canal Lining category. This tender is published in Lucknow, Uttar Pradesh location. The vendors interested in this tender and related Canal Lining tenders can obtain further details by exploring Tendersniper web portal. Tendersniper sends regular tender alerts by email specifically addressing the user requirements (i.e., keywords, location and value range). Government business is a growing area of opportunity. The businesses are encouraged to actively monitor tender opportunities and participate in them to grow their business.
Related alert: canal Tenders | all civil works Tenders | cc or concrete lining works Tenders
Related categories: Canal Lining Tenders | Canal Gates Fabrication Tenders | Canal Desilting Tenders |
Around 34545 tenders were floated in Uttar Pradesh in the past month with major spending on road repair Tenders, road construction Tenders, road relaying Tenders
| Tender Title | 1st class brick lining work with 100pct. new brick and C.C on bed from chainage 1.400 km to 1.700 km including all cost of material, labour, tool and plant etc. as per bill of quantity at Rudauli pump canal district Ayodhya |
|---|---|
| Tender Description | renovation of pump canal 1st class brick lining work with 100% new bick from 1.400 km to 1.700 km at rudauli pump canal in district ayodhya including all cost of material, labour and tool and plant etc. used complete in all respect as per drawing and boq. cc1:2:4 cm on bed from 1.400 km to 1.700 km at rudauli pump canal in district ayodhya including all cost of material, labour and tool and plant etc. used complete in all respect as per drawing and boq. |
| Comments | renovation of pump canal 1st class brick lining work with 100% new bick from 1.400 km to 1.700 km at rudauli pump canal in district ayodhya including all cost of material, labour and tool and plant etc. used complete in all respect as per drawing and boq. cc1:2:4 cm on bed from 1.400 km to 1.700 km at rudauli pump canal in district ayodhya including all cost of material, labour and tool and plant etc. used complete in all respect as per drawing and boq. |
| Published Date | |
|---|---|
| Due Date | 23 Feb 2026 00:00:00 |
| Estimated Value | 0.0 |
|---|---|
| EMD | 0 INR |
| Processing Fee | 0 INR |