The National Test House has published a tender for "Custom Bid for Services - ----" on the 30 Jan 2026. This tender belongs to OFC Laying category. This tender is published in Ghaziabad, Uttar Pradesh location. The vendors interested in this tender and related OFC Laying tenders can obtain further details by exploring Tendersniper web portal. Tendersniper sends regular tender alerts by email specifically addressing the user requirements (i.e., keywords, location and value range). Government business is a growing area of opportunity. The businesses are encouraged to actively monitor tender opportunities and participate in them to grow their business.
Related alert: optical fiber cable or ofc laying Tenders | filters Tenders | particle size measuring apparatus Tenders
Related categories: Cable TV Maintenance Tenders | OFC Laying Tenders | Junk code Tenders |
NTH issued 1 tenders for OFC Laying last year
With, 0 floated just last month.
| Tender Title | Custom Bid for Services - ---- |
|---|---|
| Tender Description | to upgrade the lan infrastructure by replacing old backbone cat6 copper cablingwith optical fiber, replacing the existing core and five distribution switches, andinstalling two new distribution switches and wi-fi access points. the existingcat6 cabling from distribution switches to i/o points will remain unchanged.a) replacement of 1 existing core switch (48-port layer 3 managed)b) replacement of 5 existing distribution switches (poe enabled)c) addition of 1 new distribution switches (poe enabled)d) laying ~500 meters of fiber optic cable (backbone)e) installation of 24 wi-fi access points (indoor & outdoor)f) installation of one 22u floor-based network rack at computer roomg) installation of proper electrical earthing at all network rack locationsh) attachment of lan diagram and proposed network topology (to determinesfp module requirements)i) marking of all i/o points linked with l2 switches during installation for easytroubleshootingj) network audit by cert-in empanelled auditor pos |
| Comments | to upgrade the lan infrastructure by replacing old backbone cat6 copper cablingwith optical fiber, replacing the existing core and five distribution switches, andinstalling two new distribution switches and wi-fi access points. the existingcat6 cabling from distribution switches to i/o points will remain unchanged.a) replacement of 1 existing core switch (48-port layer 3 managed)b) replacement of 5 existing distribution switches (poe enabled)c) addition of 1 new distribution switches (poe enabled)d) laying ~500 meters of fiber optic cable (backbone)e) installation of 24 wi-fi access points (indoor & outdoor)f) installation of one 22u floor-based network rack at computer roomg) installation of proper electrical earthing at all network rack locationsh) attachment of lan diagram and proposed network topology (to determinesfp module requirements)i) marking of all i/o points linked with l2 switches during installation for easytroubleshootingj) network audit by cert-in empanelled auditor pos |
| Published Date | |
|---|---|
| Due Date | 21 Feb 2026 00:00:00 |
| Estimated Value | 0.0 |
|---|---|
| EMD | 0 INR |
| Processing Fee | 0 INR |