The Uttar Pradesh Directorate of Local Bodies has published a tender for "Construction work of side track with interlocking tiles in front of Gurudwara Sahib Shri Dashmesh Darbar Pratap Vihar at Ward-51 Pratap Vihar Chowk." on the 31 Oct 2025. This tender belongs to Unit Paving category.  This tender is published in Ghaziabad, Uttar Pradesh location. The vendors interested in this tender and related Unit Paving tenders can obtain further details by exploring  Tendersniper web portal. Tendersniper sends regular tender alerts by email specifically addressing the user requirements (i.e., keywords, location and value range). Government business is a growing area of opportunity. The businesses are encouraged to actively monitor tender opportunities and participate in them to grow their business.
              
Related alert:  all civil works Tenders  |  road Tenders  |  road and drain Tenders  
Related categories:  Foundation Work Tenders |  Bricklaying service Tenders |  Chimney Tenders | 
            
Uttar Pradesh Directorate of Local Bodies issued 2,333 tenders for Unit Paving last year
With, 216 floated just last month.
| Tender Title | Construction work of side track with interlocking tiles in front of Gurudwara Sahib Shri Dashmesh Darbar Pratap Vihar at Ward-51 Pratap Vihar Chowk. | 
|---|---|
| Tender Description | e/w in excavation in foundation in ordinary soil etc all complete as the direction of engineer in charge. si no 251 (a). s/l p:c:c (1:6:12) with 40 mm gauge brick ballast ,fine sand of 1.25 f.m and cement in foundation and under floor including all materials, labour, tools, & plant etc all completed as per the direction of engineer - in - charge s.i n0-273 m-150 brick work in 1:4 one cement and four course sand mortar in foundation and plinth including suppy of all material labour,t&p etc required for proper completion of the work s.i no 305(a) 12 mm thick plaster with cement and coarse sand of 2.20 fineness modules in (1:3) over brick work minimum thickness not to be less than 1 cm including supply of all material, labour, tools & plant etc required for proper completion of the work. si no 584 new item) s/l of 22.4 to 53 mm gauge stone ballast with stacking for measurement etc all complete as per direction of engineer in charge rmr consolidation stone aggregates of 45-63mm/22.4- | 
| Comments | e/w in excavation in foundation in ordinary soil etc all complete as the direction of engineer in charge. si no 251 (a). s/l p:c:c (1:6:12) with 40 mm gauge brick ballast ,fine sand of 1.25 f.m and cement in foundation and under floor including all materials, labour, tools, & plant etc all completed as per the direction of engineer - in - charge s.i n0-273 m-150 brick work in 1:4 one cement and four course sand mortar in foundation and plinth including suppy of all material labour,t&p etc required for proper completion of the work s.i no 305(a) 12 mm thick plaster with cement and coarse sand of 2.20 fineness modules in (1:3) over brick work minimum thickness not to be less than 1 cm including supply of all material, labour, tools & plant etc required for proper completion of the work. si no 584 new item) s/l of 22.4 to 53 mm gauge stone ballast with stacking for measurement etc all complete as per direction of engineer in charge rmr consolidation stone aggregates of 45-63mm/22.4- | 
| Published Date | |
|---|---|
| Due Date | 13 Nov 2025 00:00:00 | 
| Estimated Value | 4.42 Lakh | 
|---|---|
| EMD | 0 INR | 
| Processing Fee | 0 INR |