Details: providing and erecting 2.00 metre high temporary barricading at site. traffic diversion upto working period temporary/permanent plugging and blocking of sewer line, branch connections and diversion of flows and removal of all plugs etc. provide everything else required for diversion f flow by pumping and/or bypassing and to maintain the sewerage system functioning normal and managing the flow without any surcharging, overflows etc. during the rehabilitation work of the sewer line and lossen, delist and thoroughly clean and remove debris and objects such as boulders, bricks etc. bacteriological slimes, roots, encrustations, grease, carbonated deposits etc. from the sewer line including disposal of silt/malba/debris for disposal to the dumping sites as per the direction of the engineer-in-charge, within the municipal limits. sinking of well 2.5 m dia. (external) in ordinary soil 9.0 - 12.0 m deep disposal of moorum/building / malba/ surplus earth,similar unserviceable, dismantled or was
Sector: Water supply and Sewerage