Details: dismantling old plaster or skirting racking out joint and cleaning the surface for plaster including disposal of to the dumping ground within 50 metars lead. dar no-15.56, 15 mm thick cement plaster with cement mortar in proportion of mix 1:4 (1 cement : 4 coarse sand). dar-13.5.1, demolishing brick work manualy by mechanical means including stacking of steel bars and disposal of unseviceable matarial with 50 metres lead as per direction of engineer-in charge in cement mortar. dar n0-15.7.4, brick work with common burnt clay f.p.s. (non modular ) bricks of class designation 7.5 in superstructure above plinth level up to floor v level in all shapes and size in cement mortar 1:4 cement and coarse sand in including supply of all materials labour t& etc required for proper completion of work as per dar.no-6.4.1, providing and fixing factory made upvc glazed/wire mesh windows/ doors comprising of lead free upvc multi-chambered frame, sash and mullion/coupler (where ever required) ext
Sector: Buildings