Details: electrical works name of work construction of 01 no nbda 9 tower 01 no db 5 kptl design tower in place of tower no 39 sa 0 and 40 sa 0 at nh 58 crossing near pachenda flyover of 132 kv muzaffarnagar bhopa road for htls conductor under etd muzaffarnagar against etender no etc mu t 03 2025 26 of etc muzaffarnagar work portion survey including prepration of profile & schedule of materials, marking of locations. check survey & final peg marking. cost of excavation of 132kv tower foundation pits including all earth work, back filling watering and leveling. setting of stubs including all foundation work but exc
Sector: Transmission