Details: demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of engineer - in - charge nominal concrete 1:4:8 or leaner mix (i/c equivalent design mix) (15.2.2) dismantling g.i. pipes (external work) including excavation and refilling trenches after taking out the pipes, manually/ by mechanical means including stacking of pipes within 50 metres lead as per direction of engineer-in-charge : 15 mm to 40 mm nominal bore (15.44.1) dismantling c.i. pipes including excavation and refilling trenches after taking out the pipes, manually/ by mechanical means breaking lead caulked joints, melting of lead and making into blocks including stacking of pipes & lead at site within 50 metre lead as per direction of engineer-in-charge: up to 150 mm diameter (15.45.1) dismantling of flushing cistern of all types (c.i./pvc/vitrious china) including stacking of useful materials near the site and disposal of unserviceable materials with
Sector: University