Details: excavation in foundation in ordinary soil (loam, clay or sand) including lift upto 1.50 m. and lead upto 30 m. and including filling watering and ramming of excavated earth intothe trenches or into the space between the|building and the sides of foundation trenchesor into the plinth and removal and disposal of surplusearth as directed by the engineer-in-charge upto a distance of 30 m. from thefoundation trenches. (where machine can no reach/move). earth work in cutting or in embakement in ordinary soil excavation to be in the form of regular pits not exceeding 0.50 m.in depth and earth bwork in embakement to be in 20 cm. layers including remming and dressing the surface to required levels and slopes and also including 1.50m. lift and 30 m.lead. the earth form of cutting to be used in making embakement or to be depossited as spoil banks with- in 50m. distance as directed by the (engineer in- charge) sor23/01/2022 construction of granular subbase by providing close graded material ,mixi
Sector: Urban Authority