Details: excavation in foundation in ordinary soil (loam, clay or sand) including lift upto 1.5m and lead upto 30m and including filling watering and ramming of excavated earth into the space between the building and the sides of the foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the e/i upto a distance of 30 m from the foundation trenches includind all t&p, phowarah and basket etc. complete. (sor 2020 s.i. no. 251) concrete with 4 cm. gauge stone ballast, coarse sand and cemnet in the proportion of 1:4:8 in foundation including supply of all material, labour and tools and plants. etc. required for proper completion of work. [sor 2020 s.i no.281] providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, portland pozzolana / ordinary portland /portland cement, admixtures in recommended proportions as
Sector: Urban Authority