Details: ahirana gali- toilet, septic tank, changing room and boring work. excavation in foundation in ordinary soil (loamclay or sand) including lift up to 1.5m and lead up to 30m. and including filling watering and ramming of excavated earth into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth ad directed by the engineer in charge up to a distance of 30m from the foundation trenches including all t&p phowarah and basket etc. complete. [pwd sor 2020 -251) earth workin cutting or in embankment in ordinary soil excavation to be the from of regular pits not exceeding 1/2 meter (20'') in depth and earth work in enbankment to be in 20cm (8'') layers , including ramming and dressing the surface to requied levels and slopes and also including 1.5m (5') lift and 30m (100') lead.the earth from cutting to be used in making embankent or to be deposited as spoil banks within 30m (100') distance as directed by the e/i and cart
Sector: Urban Authority