Details: providing and laying of rubbis on road providing and laying of local sand. excavation of foundation in ordinary soil (loam clay or sand including lift upto 1.50 meter and lead upt 30 meter and including filling. watering and ramming of ecavated earth into the trenches or into the space between the building and sides of foundation trenches or into the lingth and removal and disposal of surplush earth as directed b the engineer incharge up ot a distance of 30 meters from the foundation trenches s.i.no. 251. concrete with 4 cm. (1.5") gauge approved brick ballast, approved fine sand and cement in the proportion of 1:5:10 including supply of all materials, labour and t&p etc.required for proper completion of the work. (as in item(274 m-15 class r.c.c slab for drain cover work 1:2:4 cement, coarse sand and 20 mm gauge stone ballast.including ms bar etc.as per si no.283 mild steel or iron work in plain work such as reinforced cement concrete (whenot included in over all rate) wrought to requ
Sector: Urban Authority