Details: excavation in foundation in ordinary soil (loamclay or sand) including lift up to 1.5m and lead up to 30m. and including filling watering and ramming of excavated earth into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth up to a distance of 30m. from the foundation trenches including all t&p. sl no.- 251 providing and laying in cement concrete 1:6:12 (1cement:4 find sand :8 graded brick ballast 40mm nominal size) and curing complete, including cost of formwork in foundation and floors. sl no.- 275 close timbering in case of shafts wells cesspits manholes 350mm dia np3 hume pipe. supply and spreading fine sand in base of sewer work. s/l of 750mm dia rcc hume pipe np3. carriage of 750mm dia rcc hume pipe np3 construction of brick masonary manhole coverd with heavy duty chamber cover. m-150 brick work in faoundation p/l 12mm thick plaster work pcc 1:2:4 with cement coarse sand. rcc 1:1.5:3 with cement coars
Sector: RDPR