Details: maintenance and other related work of 08 nos. power tranformer installed at various 33/11 kv sub-station on time to time for the period of 06 months under eudd-i/v/vii, noida as per following :-note :- the material lv, hv side bushing rods, bushing, all gasket packing set, m.s. strips of t/f shall be provided by the contractor. opening of jumpering clamps from hv side of power t/f. chosing of value of conservation tank. drain out of t.f oil from t/f to drum. opening of section windows with help of nuts and bolts etc. opening hv side bushing with the help of nuts bolts and washers etc. opening lv side bushing with the help of nuts bolts and washers etc. opening and refixing of hv side bushing rod after remove carbon by amri clothes & filling and damaged rods replacement by new bushing rods in connecting rods properly with the help of gas welding and charging of all oil packing of hv side bushing rods properly. opening and refixing of lv side bushing rod after remove carbon by amri cloth
Sector: Distribution