Details: construction of granular sub-base by providing coarse graded material, mixing in a mechanical mix plant at omc, carriage of mixed material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 including cost of all material, labour, t&p & all taxes, cess etc. but excluding gst required for proper completion of work as per directed by engineer in charge. providing, laying, spreading and compacting graded stone aggregate to wet mix macadam (wmm) specification including premixing the material with water at omc in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. including cost of all material, labour, t&p & all taxes, cess etc. but excluding gst required for proper completion of work as per
Sector: PWD