Details: construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m. transporting to site, spreading, grading to required and compacting to meet requirement of table no. 300.1 & 300.2 with lead upto 1000 m as per technical specification clause 301.50 construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at o.m.c.and compacting with vibratory roller to achieve the desired density for grading 1 as per mord specification complete as per clause 401 water bound macadam grading-ii providing, laying, spreading and compacting stone aggregates of 63-45 mm sizes to water bound macadam g-2 specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber, applying and brooming requisite type of screening/ binding materials to fill up the interstices
Sector: PWD