Details: earth work in filling or embankment in ordinary soil,excavation to be in the form regular pits not exceeding 0.50m in depth and earth work in embankment to be in 20cm layers including remming and dressing the surface to required level and and also including 1.5m lift and 3.00 km lead . the earth from cutting to be use in making embamkment or to be deposite as spoil banks with in 30 m distance as directed by the engineer incharge. sub head 1 s.i. no. 2241as per dir-eng-in-charge and .i.p.w.d. sor specification. pcc concrete with 4 cm gauge approved stone grit, coarse sand & cement in the proportion of 8:4:1 including supply of all materials, labour, tools & plants etc. required for proper completion of the work. as per dir-eng-in-charge and .i.p.w.d. sor specification. providing & constructing parapet wall 1st class brick work with cement mortar 1:4 (1 cement : 4 coarse sand) cement mortar including all cost of materials, scaffolding, t&p and labours etc. per .as per dir-eng-in-
Sector: Irrigation