Details: construction of embankment with material obtained from borrow pits:- construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required and compacting to meet requirement of tables 300.1 and 300.2 with a lead upto 1000 m as per technical specification clause 301.5 excavation in soil using hydraulic excavator and tippers with disposal upto 1000 m :- excavation for roadwork in soil with hydraulic excavator of 0.9 bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per technical specification clause 302.3 granular sub-base with well graded material (table 400.1) by mix in place method :- construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on
Sector: PWD