Details: excavation in foundation in ordinary soil (loam, clay or sand) upto 30 m and including lift upto 1.50 m and lead upto 30 m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer-in-charge upto a distance of 30 m from the foundation trenches as per s.i. no. 251(a). including cost of, all material, bitumen, labour, t&p, all taxes and labour cess complete. but excluding gst. earth work in cutting or in embankment in ordinary soil in subgrade excavation to be in the form of regular pits not exceeding 0.50 m. in depth and earth work in embankment to be in 20 cm. layers including remming and dressing the surface to required levels and slopes and also including 1.50 m. lift and 30 m. lead. the earth from cutting to be used in making embankment or to be deposited as spoil banks with-in 30 m. distance and
Sector: PWD