Details: construction of embankment with approved material obtained from barrowpit with a lift upto 1.5 m, transporting to site, spreading, grading to required and compacting to meet requirement of table 300.1 and 300.2 as per technical specification clause 301.5 construction of subgrade and earthen shoulders with approved material obtained from barrow pits with a lifts and leads, transporting to site, spreading, grading to required and compacted to meet requirement to table 300.2 with lead upto 1000 m as per technical specification clause 303.1 providing, laying, spreading material on a prepared sub grade adding cement @ 2% by weight to the spread material manually mixing in place with rotavator and compacting with the road roller at omc to achieve the desired on unconfined comprassive strength and to form a layer of sub-base. providing, laying, spreading material on prepared sub base cement @ 4% by weight to the spread material manually mixing in place with rotavator and compacting with
Sector: PWD