Details: earth work in cutting or in embankment in ordinary soil, excavtion to be in the form of regular pits not exceeding 0.50 mtr. in depth and earth work in embankment to be in 20 cm. layers, including ramming and dressing the surface to required levels and slops and also including 1.5 meter lift and 30 meter lead the earth from cutting to be used in making embankment or to be deposited as spoil bank within 30 meter distance as directed by engineer incharge. excluding gst gsb construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at omc, and compacting with smooth wheel roller to achieve the desired den . excluding gst wbm grading - ii providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheeled roller 80-100 kn in stages to prop
Sector: PWD