Details: constn. of embankment with approved materials obtained from borrow pits with all lifts and leas, transporting to site, spreading, grading to required and compacted to meet requirement of table 300.1 & 300.2 with lead upto 1000m. as per technical specification clause 301.5 providing, laying and spreading materials on a prepared sub grade, adding cement @ 2% by weight to the spread materials manually, mixing in place with rotavator and compacting with the road roller at omc to achieve the desired unconfined compressive strength and to form a layer of sub-base. providing, laying and spreading materials on a prepared sub base, cement @ 4% by weight to the spread materials manually mixing in place with rotavator and compacting with the road roller at omc to achieve the desired unconfined compressive strength and to form a layer of base. providing and applying tack coat with bitumen (v.g.-10) using pressure distributor at the rate of 3.5kg per 10 sqm. area on the prepared bituminous/
Sector: PWD