Details: supply of jcb machine for levelling etc. with driver including p.o.l. all complete as directed by e/i sno.29 page11uppwdsor 2021 earth work in excavation by mechanical means (hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.dsr2023 i.n 2.8.1 all kinds of soil. 1:4:8 (1 cement : 4 coarse sand (zone-iii) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources). dsr2023 i.no 4.1.8 providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - all work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-iii) derived from natural sources : 3
Sector: Urban Authority