Details: excavation in foundation in ordinary soil (loam, clay or sand) including lift upto 1.50m and lead upto 30m and including filling watering and ramming of excavated earth into trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by engineer-in-charge upto a distance of 30m from the foundation trenches. (uppwd/sor-2020/251(b) depth from 0.0 to 1.5 m below g.l. providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - all work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-iii): 3 graded stone aggregate 20 mm nominal size). (dar/5.1.2/based on uppwd/sor-2020) painting with synthetic enamel paint of approved brand and manufacture to give an even shade : two or more coats on new work. (dar/13.61.1/based on uppwd/sor-2020) structural steel work in single section fixed with or
Sector: Industry Development