Details: providing and laying bituminous macadam with higher capacity hot mix plant using crushed aggregates of specified grading premixed with bituminous binder, transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction complete in all respect as per direction of e/i. (including labourcess but excluding gst). providing and applying tack coat with bitumen vg-10 using bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom complete in all respect as per direction of e/i. (including labourcess but excluding gst). providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (vg-30) @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic pave
Sector: PWD