Details: road work earth work in cutting or in embankment in ordinary soil excavation to be the form of regular pits not exceeding ½ meter (20") in depth and earth work in enbankment to be in 20cm (8") layers, including ramming and dressing the surface to required levels and slopes and also including 1.5m (5") lift and 30m (100') lead. the earth form cutting to be used in making embankent or to be deposited as spoil banks within 30m (100') distance as directed by the e/i sor sl .253 supply of gsb closed graded for grade-1 including spreading compacting the same gsb specification including spreading in unifrom thicknes, hand packing, rolling with three wheel 80-100 kn static roller in stages to proper grade and camber, applying and bromming stone screening/binding materials to fill up the interestices of coarse aggregate, watering and compactiong to the required density. (all quantity taken in loose) (rate analysis) providing and laying dense graded bituminous macadam with higher capacity batch
Sector: Urban Authority