Details: earth work in cutting or in embankment in ordinary soil excavation to be in the form of regular pits not exceeding 0.50 m in depth and earth work in embankment to be in 20 cm. layers including remming and dressing the surface to required levels and slopes and also including 1.50 m lift and 30 m lead. the earth from cutting to be used in making embankment or to be deposited as spoil banks with in 30 m distance as directed by the engineer in charge. with 1 km cartage sor no-253(a) including cost of, all material, labour, t&p, royality, labour cess, all taxes complete. but excluding gst. earth work in cutting or in embankment in ordinary soil excavation to be in the form of regular pits not exceeding 0.50 m.in depth and earth work in embankment to be in 20 cm. layers including remming and dressing the surface to required levels and slopes and also including 1.50 m. lift and 30 m. lead. the earth from cutting to be used in making embankment or to be deposited as spoil banks with-in 30 m
Sector: PWD