Details: earth work in filling by carted earth levelling and dressing camber proper including all material and labour t&p etc. required for proper copletion of work excavation in foundation in ordinary soil (loam, clay or sand) including lift up to 1.50 m and lead up to 30 m and including filling watering and ramming of excavated earth in to the trenches or in to the space between the building and the side of foundation trenches. construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at omc, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 supply & fixing of 80mm thick i shaped mechanically compressed inter locking cement concrete pavers block shall not be less than 30 mpa & 5 kg./no. including 4cm thick layer of fine sand & all material, labour t&p etc. tiles size=200x(160+120) m 150 brick work in one cement
Sector: Urban Authority