Details: dismentling of old s.w. pipes including breaking of joints and bed concrete stacking of useful materials near the site within 50 m lead and disposal of unserviceable meterials into municiple dumps 100mm diameter. d.s.r. no.-19.5.1 earth work in excavation by mechanical means (hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the all kinds of soil. d.s.r. no.2.8.1 providing and laying in position cement concrete of specified grade excluding the cost of centering, shuttering -all work up to plinth level : 1:5:10 (1 cement : 5 coarse sand (zone-iii) : 10 graded stone aggregate 40 mm nominal size derived from natural sources)dsr item no.4.1.10 brick work with common burnt clay f.p.s. (non modular) bricks of class designation 7.5 in super str
Sector: Buildings