Details: construction of embankment with material obtained from r.o.w. construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required and compacting to meet requirement of tables 300.1 and 300.2 as per technical specification clause 301.5 including all material t&p, labour cess etc but excluding cost of gst providing, laying and spreading material on a prepared sub grade, adding cement @ 2% by weight to the spread material manually, mixing in place with rotavator and compacting with the road roller at omc to achieve the desired unconfined compressive strength and to form a layer of sub-base (ctsb) including all material t&p, labour cess etc but excluding cost of gst construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on preared surface, mixing by mix in place method with rotavator at omc, and compacting with smooth wheel roller to achive the
Sector: PWD