Details: excavation in soil using hydraulic excavator ck 90; excavation for roadwork in soil with hydraulic excavator of 0.9 bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections. sr. no. 3.6a morth sp-301 (all complete as per e/i) construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. sr. no. 3.17 morth sp-305 (all complete as per e/i) construction of embankment with material obtained from borrowpits; construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required and compacting to meet requirement of table 300-2. sr. no. 3.16 morth sp-305...(in non-habitational length) (all complete as per e/i) construction of earthen shoulders with approved material obtained from b
Sector: PWD