Details: excavation for roadwork in soil with hydraulic excavator of 0.9 bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, spreading, grading to required and compacting to meet requirement of tables 300-1 and 300.2 per technical specification clause 301.5 construction of granular sub-base (grading-1) by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at omc, and compacting with smooth wheel roller to achieve the desired density, complete as per technical specification clause 401 providing, laying, spreading and compacting stone aggregates of 45-63mm to water bound macadam specification including spreading
Sector: PWD