Details: excavation in foundation in ordinary soil ( loam clay or sand) including lift up to 1.5 meter (5ft) and lead upto 30m (100ft) and including filling,watering & ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as direction by the engineer-in-charge upto a distance of 30m(100ft) from the foundation trenches. boring of 30cm dia piles of single under reamed of 50cm dia of bulb and 3.5 meter depth in black cotton soil with hand operated auger machine including all laboure t&p etc. for proper completion of work as per is code-2911(part-iii) 1980. cement concrete with 4cm (1/2'') gauge approved stone ballast, approved coarse sand. cement in the proportion 1:4:8 including supply of all materials,labour and tools and plants etc. required for proper completion of the work. rcc work with cement approved coarse sand and 2cm. (3/4'') gauge approved stone ballast in t
Sector: Urban Authority