Details: dismentling brick work or stone work in lime or cement mortar and including stacking of materials as directed by the engineer-on-charge with in a distance of 60m. ( si no.692/2022) cartage of ballast, kankar, coal, grit or sand etc. including loading & unloading but excluding stackings on pucca roads (si no. 231a/2022) up to 5 km distance concrete with 4cm. gauge stone ballast, coarse sand of 2.20 f.m and cement in proportion of 8:4:1 in foundation and under floors, including supply of all materials, labour, t&p etc. required for proper completion of the work. (s.i. no. 281/2022) rcc work with cement, approved coarse sand and 40mm stone grit in proportion of 1:1.5:3 in raft and foundation excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 b.w.g.g.i. binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, t&p etc. required for proper completion of the work, including cost of b
Sector: Urban Authority