Details: earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by engineer-in- charge(all kind of soil) filling of carted earth in plinth including supply of necessary quantity of earth from a distance not exceeding 8km from the side of work and including watering dressing etc. required for proper completion of work.(lead up to 30m & lift 1.5m) providing and laying in position ready mixed or site batched design mix cement concrete for plain cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, portland pozzolana/ordinary portland /portland cemnt, admixture recommended proportions as per is: 9103 to accelerate / setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the
Sector: Infrastructure