Details: earth work cutting or in embankment to in patri oridinary soil, excavation to be in the from of regular pits not exceeding 0.5m in depth and earthwork in embankment to be in 20cm. layers, including ramming and dressing the surface to required levels & slopes & also including 1.5m. lift & 30m. lead the earth from cutting to be used in making embankment or to be deposited as spoil banks within 30m. distance as directed by the engineer-in-charge (excluding royalty) as per si. no. 253. (execluding g.s.t) construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader/tractor mounted appropriate equipment on prepaire suface mixing by mix in place method with rotavator at omc, and compacting with smooth roller to achieve the desired density, complete as per clause 401. (execluding g.s.t) construction of stablized granular sub-base by providing well graded material with 2% cement(opc), spreading in uniform layers with motor grader/tractor
Sector: PWD