Details: excavation for in to ixed with morum/kankar with lift upto 1.5m and lead upto 30m from center of the trench and refillling of earth after laying of pipe line (as per jalnigam) supply of the following size of pipe line 90mm dia p.v.c. 6 kg/sq.m isi marked supply of all specials for the laying above pipes (10% of 2) carting from store to site of work to the following pipes lowering then into the renches laying true the alignment and gradient and jointing and testing including cutting of pipes for making a required length etc. cor. plete. 90mm dia p.v.c. 6 kg/sq.m isi marked filling in foundation and plinth of pipe line with selected yellow soil in layers of 20cm. thickness ramming and consolidation etc. complete (as per jalnigam sor no. 1004 available) supply of following types of fitting including all taxes and duties complete. supply of fixing 80 mm dia cl. sluce valve as per 1.5 780 suitable working pressure of 10 kg/sqm. air valve 20 mm dia rcc with cement cross & mm gauge sto
Sector: RDPR