Details: transportation transportation, installation, dismantling of rig achine and logging of bore hole. drilling and lowering of tube well assembly of rig machine and camp equipment at site. dismentalling of rig machine and camp equipage after complition of work. drilling of bore of 675mm dia (with pilot) bore. gl to 100 mbgl 675mm. dia bore 101 to 160 mbgl 675mm dia bore loging of bore holw by departmental / approved electric logger. zone testin in water quality problem ares including all required material. labour, t&p etc complete in all respest (at least 03 nos. start a sample) lowering of tube well assembly of 300 mm dia size with shrouding of pea-gravel. gl to 100 mbgl (300mm. dia) 101 to 150 mbgl (300mm. dia) tube well assembly ms tubewell assembly with all required parts like plane pipe, slotted pipe (as required up to 50% of plane pioe) rings, wall cap ball plug, clamp, reducer, central guide, support structure etc. as required & as per typed design complete in all respect
Sector: RDPR