Details: excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.50m and lead upto 30m and lead upto 30m and including filling watering and ramming or excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer - in-charge upto a distance of 30m from the foundation trenches. earthwork in cuting of in embankment in ordinary solexcavation to be done from regular pits not exce den and work embankment to be in 20 cm layng and dressing the surface to required pred levels and earth from outting to be used in making esiopes and also including 1.5m is and lead up to 8 km the mentor to be deposited as spoil banks within 30m distance as directed by ne engineer in-charge, excluding the cost of royalty of earth construction of granular sub-base by providing coarse graded material spreading in uniform layer with motor grader oprepared surface
Sector: Urban Authority