Details: survey including preparation of schedule of materials, marking of locations (route length),gps survey of line with co-ordinates of each tower(the length of line shall be authenticated by gps survey)(approx.02km.) to provide:- (a)route survey details (b)length of line (c)tentative no. of tower, type of tower, (d)no. of railway/highway/power line/river crossing (e)route mark topo sheet (survey of india map) (02 set)
Sector: Transmission