Details: excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.50 meter and lead upto 30 meter and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and sides of foundation trenches or into the plinth and removal and disposal of sur-plus earth as directed by the engineer incharge up to a distance of 30 meters from the foundation trenches. providing and laying in cement concrete 1:4:8 (1 cement : 4 coarse sand :8 graded stone aggregate 40 mm nominal size) and curing complete,including cost of form- work, in foundation and floors. r.c.c. work with cement approved coarse sand and 20 mm. guage approved stone grit im the proportion of 1:1.5:3(1 cement : 1.5 coarse sand : 3 stone aggregates) in lighter beams i.e. having spans upto 6 m. excluding supply of reinforcement and its fixing and binding the same with 24 bwg binding wire and including necessary centering and shuttering etc.and also including suppl
Sector: Sugar