Details: earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. sand filling in plinth including supply of necessary quantity of sand the site of work & including watering, dressing etc. rate to include cost of all materials, labour and tools & plants etc. required for proper completion of the work. plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. plain/reinforced cement concrete m25 in foundation m25 in raft & app. slab as per drawing and technical specification. plain/reinforced cement concrete m25 for wall (abutment & pier) & slab etc. complete as pe
Sector: PWD