Details: earth work in foundation in dry ordinary soil including lift upto 1.5m and lead up to 30m and including filling, watering and ramming excavated earth into the trenches or into the space between the structure and the sides of foundation trenches or into the plinth with removal and disposal of surplus earth as directed by the engineer in charge up to distance of 30m from the foundation trenches. providing & laying c.c. 1:3:6 in foundation with crushed aggregate & coarse sand with all cost of material, t&p and labour complete. providing & fixing centering and shuttering for r.c.c. work including placing in position & removing complete. s/fixing reinforcement for r.c.c. including bending, binding and placing in position with all cost of material, t&p and labour complete. providing & laying r.c.c. 1:1:2 in slab with crushed stone ballast and coarse sand including cost of material, t&p and labour complete. providing & laying c.c. 1:2:4 in slab wearing coatwith all cost of material, t&p a
Sector: Irrigation