Details: following works are to be carried out at 132 k.v. sub station avas vikas, lucknow for replacement of 2 no. existing 40 mva 132 / 33 kv transformer -i & ii (ece & accurate make) by new 63 mva 132 / 33 kv transformer (make) alongwith associated works against increasing capacity including all cost of men, misc. consumables, t&p, crane, centrifuging machine etc. to complete the job satisfactorily : dismantling and shifting of old 40 mva transformer-i & ii rtcc panel from c & r room including necessary disconnection of control cables including identification of cables for necessary future connections and shifting the same at proper place / store as per direction of site engineer.(one job for each t/f) of 63 mva transformer rtcc panel including shifting from storage place to c & r room as per direction of site engineer.(one job for each t/f) complete safe dismantling of the accessories of 132 / 33 kv 40 mva transformer-i & ii (ece & accurate make) including opening of jumpers, removal of e